Construction connectivity has one structural absurdity: you need permanent-grade internet on a temporary site. The old way pays permanent prices for it — $10k to $60k of trenched fiber (more in the rural stretches), 90 to 180 days of carrier lead time, and at handover the whole investment gets abandoned in the ground.

The new way: a bonded multi-carrier 5G gateway — Starlink in the mix where coverage is thin — with managed Wi-Fi access points, live the day the trailer lands. A mid-rise GC we worked with got site-wide Wi-Fi in one day for less than a tenth of their fiber quote. A heavy-civil joint venture on a rural interchange, where no single carrier delivered 10 Mbps, bonded four carriers plus Starlink into a link their cameras, drones, and Procore syncs actually lived on. And when the job ends, the kit unbolts in an afternoon and mobilizes to the next site — the economics amortize across every future job instead of dying with this one.

Construction Connectivity 101 walks through the whole model: the old-way-versus-new-way math, camera and sensor VLANs that replace a dozen per-device SIM plans, sizing site Wi-Fi as the building rises, and the pooled data plans that make the monthly bill boring. One bad trailer day costs more than the entire kit. Do the math once and the old way never survives it.

← All writing